Replacement of aging water infrastructure for a major NOC oil field in the Middle East

Platform
16 wells and 10.5 km of water line upgrades
Location: Saudi Arabia
Operator: Confidential client
Duration: 2021 - 2024
Scope: Construction

Our Engineering & Projects team worked on replacing aging water infrastructure in one of our client’s oil fields in Middle East. The scope included the replacement of 16 wells with carbon steel piping and the installation of 3 carbon steel headers. Additionally, 10.5 km of 42-inch and 30-inch RTR pipes were constructed, and the existing 10.5 km of old RTR pipes demolished and removed.

Scope:

  • Replacement of 16 wells with carbon steel piping.
  • Installation of 3 carbon steel headers.
  • Construction of 10.5 km of 42-inch / 30-inch RTR pipe.
  • Demolition and removal of 10.5 km of existing 42-inch / 30-inch RTR pipe.
Craft 3