Jan De Nul engaged Kent as foundation designer for the FEED stage for the WTG foundations. The site varies between 16m and 33m water depth and has very challenging ground conditions with the presence of stiff rock across the site. Wind turbine envelope of up to 15MW with a windfarm total capacity of up to 375MW.
Support provided included geotechnical, primary and secondary steel, grouted connection and materials and corrosion.
By using our website you consent to all cookies in accordance with our Privacy Policy.