We worked on upgrading a major ethane facility, focusing on the installation of an ethane pipeline with associated well site flow lines, valves, and fittings. The project also included integrating corrosion inhibitor and methanol injection skids, a Fiber Optic (FOC) and data network system, cathodic protection, and a SCADA system with Remote Terminal Units (RTUs). Additionally, we delivered IT transmission and telephone networks, valve stations, burn pits, and the construction of a new water pipeline with all necessary valves and fittings.
Scope:
By using our website you consent to all cookies in accordance with our Privacy Policy.