Kent provided comprehensive design and engineering expertise for the relocation of the ex-loading dock piping system for a major NOC in the Middle East. Our role included designing an efficient diesel fuel supply system that integrates Sea Berth-1 & 2 with the North Dolphin-A platform and Onshore facilities. Kent optimised fuel flow, minimised transit times, and ensured compliance with international safety standards, all while maintaining operational continuity.
Scope:
By using our website you consent to all cookies in accordance with our Privacy Policy.