Multi-storey facility within limited space constraint
Location: Kingdom of Saudi Arabia
Operator: Center3
Duration: May 2023 - December 2025
Kent Data Centres engineered a multi-storey, high-availability facility designed for scalability and efficiency within a 9,000 sqm footprint.
Challenge:
- Deliver 7.2 MW of IT capacity within limited site constraints.
- Achieve Tier III/IV resilience while maximising energy performance.
- Coordinate multidisciplinary design and construction activities.
Solution:
- End-to-end design, engineering, and supervision services.
- Optimised MEP and architectural solutions for balancing power and cooling.
- On-site quality control ensuring compliance with global standards.
Outcome:
- Future-ready co-location facility with exceptional efficiency and reliability.
- Streamlined approvals and reduced delivery risk.