Confidential Client

Commissioning & Start-up Services on a Landmark Kazakhstan Energy Development

FGP Kazakhstan Web banner
Delivering one of the industry’s most complex commissioning programmes – on time, safely, and with a local-first legacy
Operator: Confidential Client
Scope: Commissioning & Start-up (CCS)
Location: Kazakhstan
Duration: 2019–2025

Kent successfully delivered a multi-discipline commissioning and start-up programme on one of the world’s most significant onshore energy developments, located in Western Kazakhstan. Over a six-year period, the project became the largest commissioning campaign in Kent’s history, spanning five concurrent scopes and peaking at over 3,800 personnel.

With a total of 24.5 million work hours completed without a single Lost Time Incident (LTI), the project stands as a benchmark for Kent’s capability in safely managing complexity, accelerating performance under pressure, and building lasting partnerships with local communities.

Scope of Work

Kent was responsible for the end-to-end commissioning of five integrated scopes, including:
• Processing and compression facilities
• Sour gas injection infrastructure
• 110kV power distribution and substations
• Field gathering and pipeline systems
• Utility, control and data centres

Services delivered included:
• Systems completions
• Static and dynamic commissioning
• Start-up support
• Vendor and subcontractor coordination
• Temporary power and utilities
• Personnel training and handover support

Key Achievements

Category

Performance

Workforce at Peak

3,820+ personnel

Safety

24.5 million LTI-free work hours

Training

66,817 courses delivered

National Workforce

96% participation rate

Local Content

86% of spend retained in-country

Monthly Work Hours (Peak)

550,000+ hours

Scopes Delivered

5 concurrent scopes over 6 years

Kent’s Role

In the final phases of the project, Kent was called upon to take over a critical scope that had fallen behind schedule. Through rapid mobilisation, disciplined execution, and strategic vendor integration, Kent accelerated delivery to support the safe and successful achievement of First Oil in January 2025 – two years ahead of revised forecasts.

Differentiators

• Proven expertise in large-scale, multi-scope commissioning campaigns
• Deep-rooted presence in Kazakhstan, with 26+ years of operational experience
• Industry-leading safety performance and cultural alignment
• Scalable mobilisation and integrated contractor management
• Digital commissioning enabled by Kent’s CommissionAbility ecosystem

Result

Kent’s ability to integrate seamlessly into execution and lead through complexity helped the client safely bring a high-value asset into production. Beyond technical delivery, the project left a legacy of national workforce development and regional industry uplift, establishing a benchmark for future mega-projects across the region.

Craft 3
the energy within.