We provided detailed engineering services for the design and installation of a 36 km dual 4-inch underground RTP piping network for a Gas Lift Ring. Our expertise ensured the seamless connection of 12 manifolds and 14 wells to the Gas Lift Ring, which links to an existing Gas and Oil Separation Plant (GOSP) through a designated manifold, optimising gas lift operations.
Scope:
By using our website you consent to all cookies in accordance with our Privacy Policy.