Suggestions
News & Insights
No results found
Confidential client

Construction of Eleven Wells in a Single Well Pad for an Oil & Gas Field

Industrial Facility Interior with Large Piping System
Construction of 11 wells in a single well pad
Location: Saudi Arabia
Operator: Confidential
Duration: 2023 - 2024
Scope: Construction

We worked on the construction of 11 wells in a single well pad for an oil and gas field in Saudi Arabia, including cathodic protection (CP) works. This tie-in project supports the integration of new wells into the existing infrastructure, ensuring efficient operation and protection of the well facilities.

Scope:

  • Construction of 11 wells on a single well pad.
  • Completion of cathodic protection (CP) works for the new wells.
  • Tie-in to existing infrastructure at Berri DS-5.
Craft 3
the energy within.
Contact

By using our website you consent to all cookies in accordance with our Privacy Policy.

×